Installation item · Capacity and bottlenecks

Combine cycle time, setup and downtime to find workload and the hours still uncovered after overtime.

Premium preview · Member downloads are not yet available · Excel workbook in Turkish

Results from the sample workbook

Workload (hours)
468.58
Overtime hours
89.17
Capacity gap
124.7

Who can use it, and for what?

Electrical and mechanical contracting

For teams tracking installation item records by project site. Combine cycle time, setup and downtime to find workload and the hours still uncovered after overtime.

A worked example from the workbook

These figures come from 16 fictional records in the workbook’s Panel sheet.

MeasureSample result
Workload (hours)468.58
Overtime hours89.17
Capacity gap124.7
Overtime cost5,795.83

How do you start with your own data?

  1. Choose a start and end date on Panel. If the workbook has assumptions, replace the example values with your own.
  2. Replace the sample records in the yellow cells on Girdiler. Enter a unique ID and a valid date for each record.
  3. Review period totals and breakdowns on Panel. Resolve flags on Kontrol and trace calculations on Hesap.

Workbook input fields

Labels appear in Turkish in the workbook.

  • Teslim hedefi (Montaj birimi)
  • Birim işlem (dk)
  • Hazırlık (saat)
  • Normal saat
  • Duruş (saat)
  • Kayıp oranı

Sample assumptions

Azami ek saat
7
Ek saat bedeli
65